Galliford Try Partnership, Southway, Plymouth

Re generation of an old school site, providing 67 much needed affordable homes to a very populated part of Plymouth.

FCG’s works include all associated infrastructure works, comprising of reduce level excavations and subsequent cart away of arising materials. Construction of the foundations, substructure blockwork and beam and block floors. Building of all the necessary retaining wall structures to allow the best use of the existing site contours. Installation of all required private plot drainage and accompanying soakaways, which all link into the new main adoptable drainage system, before connecting the existing sewer system or attenuation on site. All private parking areas and access roads linking again to a new adoptable main road system, adjoining the existing roads at both the top and bottom of the site.